Abstract:
From constructing to test running,the entire process of the digital strong motion network of Shandong Province is introduced.The distribution,the index of instrumental performance and the trial operation in debugging of the fixed station installation are described in detail.Observation data during the trial operation is analyzed with typical seismic waveforms during the trial run presented.Rationalization proposals for expansion of digital strong motion network of Shandong Province are also presented.