MENG Fan-yue, WANG Dong-ling. The Application and Research of the Joint Exploration of Electric Method in the Detection of Susong-Zongyang Fracture (Toupo Section)[J]. North China Earthquake Sciences, 2018, 36(2): 70-75. DOI: 10.3969/j.issn.1003-1375.2018.02.012
Citation: MENG Fan-yue, WANG Dong-ling. The Application and Research of the Joint Exploration of Electric Method in the Detection of Susong-Zongyang Fracture (Toupo Section)[J]. North China Earthquake Sciences, 2018, 36(2): 70-75. DOI: 10.3969/j.issn.1003-1375.2018.02.012

The Application and Research of the Joint Exploration of Electric Method in the Detection of Susong-Zongyang Fracture (Toupo Section)

  • Based on the previous research to Susong-Zongyang fracture, combined with specific engineering by using electric joint exploration technology for target detection fault, through multiple line and a variety of methods of validation, we managed to detect the target fault, and then analyzed the detection results. It is proved that the detection of hidden faults in hilly areas has its unique advantages and may has a wide application prospect in earthquake safety assessment.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return