童广秀, 刘康和. 黄河沙坡头水利枢纽坝基岩体灌浆效果检测[J]. 华北地震科学, 2003, 21(4): 35-41.
引用本文: 童广秀, 刘康和. 黄河沙坡头水利枢纽坝基岩体灌浆效果检测[J]. 华北地震科学, 2003, 21(4): 35-41.
TONG Guang xiu, LIU Kang he. DETECTION FOR THE GROUTING EFFECT OF DAM BASE IN SHAPOTOU RESERVOIR ON YELLOW RIVER[J]. North China Earthquake Sciences, 2003, 21(4): 35-41.
Citation: TONG Guang xiu, LIU Kang he. DETECTION FOR THE GROUTING EFFECT OF DAM BASE IN SHAPOTOU RESERVOIR ON YELLOW RIVER[J]. North China Earthquake Sciences, 2003, 21(4): 35-41.

黄河沙坡头水利枢纽坝基岩体灌浆效果检测

DETECTION FOR THE GROUTING EFFECT OF DAM BASE IN SHAPOTOU RESERVOIR ON YELLOW RIVER

  • 摘要: 采用声波测井、地震CT等综合物探方法,对沙坡头水利枢纽坝址基础岩体固结灌浆效果进行检测,基本查明了坝基岩体固结灌浆后的质量状况,取得了良好的应用效果。

     

    Abstract: The grouting effect of dam base in Shapotou reservoir is detected with some methods such as sonic logging, seismic CT, etc. the grouting quality of the base is found out.

     

/

返回文章
返回